Bathroom Remodeling Photo Album: Bathroom Remodel- Toledo, OH September 2020
This shows the liner that was placed over the tile.
With limited space in the tub, the ledge was used for the storage of toiletries.
The tile that was left behind the vinyl surround.
A new straight wall tub in alabaster white is installed with new moisture resistant drywall behind the new subway tile pattern surround.
Prepping to add in the hardware and to seal in the seams of the panels. 3x6 subway tile pattern in Alabaster White.
Grab bars for safety and sheves for storage.
Delta 2 in 1 Linden Monitor 17 Series shower head. Panels are sealed and look seamless.
Finished, clean and polished!
Album Description
Arnold's took out an old liner and tile from the surround and replaced it with new moisture resistant drywall and Alabaster White 3x6 subway tile. Adding in grab bars for safety and prairie shelves for in-shower storage.